Freedom Energy Diesel
Headquarters Building and Plant

Area in Square Feet Plant Building 550,000
Area in Square Feet Headquarters 40,000

Scope of Services: Schematic Design and Site Planning for future coal gasification process using advanced methods to produce fuel oil from coal. Site planning includes building placement, railroad and vehicular access, utilities planning, and parking and security. Schematic Design includes layout and design of executive Headquarters Building featuring an open atrium with glass elevator, training center for 100 people, main level with 10,000 square feet of offices and employees locker rooms. Second level for 10,000 square foot executive suite, 5,000 square feet of offices and 5,000 square feet of hospitality area including cafeteria, open-air mezzanine, wet bar and coffee bar. Schematic Design also includes planning of plant floor for access, fire protection, equipment location and HVAC.

Interior Design Services.